Guidelines for all SOLARIS developments
Back
Deliverable D1.1 Guidelines for all SOLARIS developments is a collaborative effort between all the SOLARIS project partners, and aims to add the necessary context, details on the implementation and methods for testing of the project tasks in work packages 2 through 5, with the grant agreement as basis and starting point.
To this end, in section 1 Technical requirements and specifications for work packages 2, 3, 4, and 5, each task leader has provided details at task level regarding the: task background, data and hardware requirements of each task, technical specifications for implementation of the task, method for testing and validation of the task implementation/result, KPIs for assessment of the task outcomes, and role of the other project partners in the respective tasks.
Section 2 of the deliverable details the data integration and interoperability specifications within the project, as they can be estimated at this point, both from the perspective of the demonstration site operators as well as from the perspective of the technology developers in this project.
Section 3 summarizes the main technical specifications of the four demonstration sites (DTU, PPC, FIB, EILAT), as well as specific data and demonstration requirements from the technology developer partners (AAU, EMA, UBI, UNIGE, HELIO, AIR6, DTU, TEKNIKER) from these sites, as they can be foreseen at this point, and which will be used as a basis for WP6.
Section 4 presents the 9 uses cases at the core of the SOLARIS project results and outcomes, putting in context the technology developed by each project partner, with the real-world application and testing of this technology.
Section 5 provides details on the main project key performance indicators (KPI), in terms of description and significance, method of calculation or measurement, necessary data and tools, literature context for the KPI, timelines and demonstration site for evaluation, role of the project partners and eventual contingencies.